Current projects

Projects currently in execution

A inexhausitve list of active projects is available here

 

Increasing the use of Renewable energy sources by using Demand Side Management

Duration of the project: 01/10/2009-30/09/2012

Implementation of active demand management, to allow more renewable energy use on the electricty net.
In cooperation with: KHLim, VITO, KULeuven
More info: http://meerhebdoordsm.khk.be

Up
V@k

Duration of the project: 2009-2011

Because of fast developments, it is difficult to keep up to date with the latest technology in HVAC world.
Our partners (installation firms) choose to combine E-learning and practical contact lessons, better known as "Blended Learning" as the most suitable way to get & stay informed.

In cooperation with: VIA, KHLim, Fontys, Hogeschool Zuyd, Damiaan Instituut Aarschot, TI Sint-Lodewijk Genk, TVVL en Atic
More info: zie detailfiche  (only available in Dutch!) and also http://www.hvac-leren.eu/

 
Up
   Monitoring of a low energy residential building

Duration of the project: 01/09/09-31/08/11

This low energy residential building is equipped with the most modern technologies (heat pump, balanced ventilation, active sun screen, etc) .All temperatures and energy flows inside are monitored and visualised online.

In cooperation with:  Structabo
More info: see detailfiche (only available in Dutch!) or projectwebsite

Up  
 E-calculator

Duration of the project: 15/01/2010 - 30/09/2010

Nowadays, quite a lot of "energy saving" investments can be made, each with his own cost and impact on a building. This project wants to create a tool for both the buyer and building constructor, to aid them in the choice which investments are the most suitable.

In cooperation with: VCBKoning Boudewijnstichting  (only available in Dutch!)
More info: zie projectwebsite koning bouwdewijnstichting (only available in Dutch!)

 E-Calculator-picture
Up  
 SmartGrids European Technology Platform-picture
The flemish Smart Grid Platform (VSGP)

The VSGP wants to ease the implementation of research results about (electrical) smart grids in practice, together with research institutions, firms and goverments.
 

KCE is a partner of the VSGP
More info: Se detailfiche (only available in Dutch!) or  www.vsgp.be

Up  

Duration of the project: 01/09/2007 - 31/08/2010

What is the saving potential , from re-balancing a heat-distribution network in a building? Most of the time, only the heat generation plant is optimised, while a potential of 0-30% savings can be easily achieved!

More info: zie detailfiche (only available in Dutch!)

Up  
Brandstofcel
Development of a simulation model of an alkalic fuel cell.

Duration of the project: 2007 - 2012

This PHD creates a a stationary (or partially dynamic) prediction model about an alkalic fuel cell. This will visualise and quantify the possible improvements when modifying the fuell cell parameters.

More info:zie detailfiche (only available in Dutch!)

Up  
Hydrogen net

Duration of the project: 01/06/2009-31/08/2012

Realisation of a knowledge region about hydrgogen and hydrogen technology, in Flanders & South of The Netherlands.

KHK is a partner of Hydrogen net (waterstofnet).
In cooperation with: Interreg, BOM, ECN, VSWB, IMEC, Power-Link,KHLim, Fontys, KdG, UGent, Hogeschool Zuyd, SPK, Avans Hogeschool
More info:zie detailfiche (only available in Dutch!)

 
logo europese Unie
Up  
 PCM-picture
PCM = phase change materials

Duration of the project: 01/09/2008- 01/09/2011
 

PCM's are materials with a high latent heat content (while melting). This project assesses PCMS's to enlarge the thermic buffer capacity of limited storage vessels, at temperatures 25-40°C.

More info: zie detailfiche (only available in Dutch!)

Up  
Photovoltaic solar cells
Duration of the project: 15/12/2009- 15/12/2011

In this project, differences between build-in and build-up photovoltaic solar cells are investigated and quantified.

In cooperation with: Izen energy systems
More info: zie detailfiche (only available in Dutch!)

 
Up  
Doctroraat Verwarmingsrendement-picture
PHD: Overall efficiency of heating systems in low energy buildings.
Duration of the project: 20/05/2004 -31/12/2010

This PHD  is part of a larger research goal that aims to improve the efficiency of buildings, on SYSTEM level.  Tough building components are selected optimally, the combination isnt always optimal: Most well insulated buildings with heating systems optimised for winter conditions, have very low heating efficiencies in mid-season!

More info: zie detailfiche (only available in Dutch!)

Up  
Selection of control and communication hardware for integration in EcoSCADA (online energy management system)

Duration of the project: 2009 - 2010

The energy management system EcoSCADA is currently impemented on a wide range of industries. Therefore, it needs to cooperate with a vast group of hardware. Gateways and suitable components are  required, to fit this management system.


In cooperation with: een Vlaamse KMO
More info: zie detailfiche (only available in Dutch!)

EcoSCADA-picture
Up  
DraadloosLoggen-picture
Selection of suitable mobile energy logging & controlling equipment.
Because of the shift from "energy visualisation" towards "energy management", two way comunication is becoming critical, to send commands for good energy management back from the controller to the user. meer. This project will list currently available and cost-effective bi-directional mobile technologiesfor energy logging/control.

In cooperation with: een Vlaamse KMO
More info: zie detailfiche (only available in Dutch!)

Up  
Development of flexible platform for multi-diciplinary case studies  (OOF) 
Often the classes in our university college are illustrated using trans-diciplinary case studies. This project will develop a web-based platform, that can handle the flexible needs of multi-diciplinary case studies.

More info: zie detailfiche (only available in Dutch!)

Up  
REDEEM-picture
Promotion of renewable energy use (e.g. bio-gas) in Kroatia
Kroatië is aiming to join the European union in the (near) future. One of the most important pitfalls on this route, is their current bio-waste management. To solve this problem, and  to reach the target of 5,7% production of green-renewable energy, they are working on (partially) converting the bio-waste into bio-gas. For knowledge and technology transfer about these installations, they are counting on flemish support.

More info: zie detailfiche (only available in Dutch!)

Up  
   
Up  

 

 

  • A short description on the topic
  • List of partners or coöporating companies
  • Also links are provided where more details can be found

Seperately, all projects are organised in
pillars and based upon the type of coöperation:
Internal funding, supported by KHKempen
  • Projects with reference "TeTra", supported by the IWT-fund.
  • Doctorates (PhD's), in cooperation with KHKempen
  • KMO-portefuille projects, in cooperation with small firms and the Flemish government


Up